Jump to content

Apollo 13

Page semi-protected
From Wikipedia, the free encyclopedia

Apollo 13
see caption
Odyssey's damaged service module, as seen from the Apollo Lunar Module Aquarius, hours before reentry
Mission typeCrewed lunar landing attempt (H)
OperatorNASA
COSPAR ID
  • CSM: 1970-029A
  • LM: 1970-029C
SATCAT no.4371[1]
Mission duration5 days, 22 hours, 54 minutes, 41 seconds[2]
Spacecraft properties
Spacecraft
Manufacturer
Launch mass44,069 kg (CSM: 28,881 kg;[3] LM: 15,188 kg)[4]
Landing mass5,050 kilograms (11,133 lb)[5]
Crew
Crew size3
Members
Callsign
  • CSM: Odyssey
  • LM: Aquarius
Start of mission
Launch dateApril 11, 1970, 19:13:00 (1970-04-11UTC19:13Z) UTC[6]
RocketSaturn V SA-508
Launch siteKennedy LC-39A
End of mission
Recovered byUSS Iwo Jima
Landing dateApril 17, 1970, 18:07:41 (1970-04-17UTC18:07:42Z) UTC
Landing siteSouth Pacific Ocean
21°38′24″S 165°21′42″W / 21.64000°S 165.36167°W / -21.64000; -165.36167 (Apollo 13 splashdown)
Flyby of Moon (orbit and landing aborted)
Closest approachApril 15, 1970, 00:21:00 UTC
Distance254 kilometers (137 nmi)
Docking with LM
Docking dateApril 11, 1970, 22:32:08 UTC
Undocking dateApril 17, 1970, 16:43:00 UTC
Apollo 13 logo Three astronauts posing behind a lunar globe
Jim Lovell, Jack Swigert, Fred Haise

Apollo 13 (April 11–17, 1970) was the seventh crewed mission in the Apollo space program and would have been the third Moon landing. The craft was launched from Kennedy Space Center on April 11, 1970, but the landing was aborted after an oxygen tank in the service module (SM) exploded two days into the mission, disabling its electrical and life-support system. The crew, supported by backup systems on the lunar module (LM), instead looped around the Moon in a circumlunar trajectory and returned safely to Earth on April 17. The mission was commanded by Jim Lovell, with Jack Swigert as command module (CM) pilot and Fred Haise as Lunar Module (LM) pilot. Swigert was a late replacement for Ken Mattingly, who was grounded after exposure to rubella.

A routine stir of an oxygen tank ignited damaged wire insulation inside it, causing an explosion that vented the contents of both of the SM's oxygen tanks to space.[note 1] Without oxygen, needed for breathing and for generating electric power, the SM's propulsion and life support systems could not operate. The CM's systems had to be shut down to conserve its remaining resources for reentry, forcing the crew to transfer to the LM as a lifeboat. With the lunar landing canceled, mission controllers worked to bring the crew home alive.

Although the LM was designed to support two men on the lunar surface for two days, Mission Control in Houston improvised new procedures so it could support three men for four days. The crew experienced great hardship, caused by limited power, a chilly and wet cabin and a shortage of potable water. There was a critical need to adapt the CM's cartridges for the carbon dioxide scrubber system to work in the LM; the crew and mission controllers were successful in improvising a solution. The astronauts' peril briefly renewed public interest in the Apollo program; tens of millions watched the splashdown in the South Pacific Ocean on television.

An investigative review board found fault with preflight testing of the oxygen tank and Teflon being placed inside it. The board recommended changes, including minimizing the use of potentially combustible items inside the tank; this was done for Apollo 14. The story of Apollo 13 has been dramatized several times, most notably in the 1995 film Apollo 13 based on Lost Moon, the 1994 memoir co-authored by Lovell – and an episode of the 1998 miniseries From the Earth to the Moon.

Background

In 1961, U.S. President John F. Kennedy challenged his nation to land an astronaut on the Moon by the end of the decade, with a safe return to Earth.[11] NASA worked towards this goal incrementally, sending astronauts into space during Project Mercury and Project Gemini, leading up to the Apollo program.[12] The goal was achieved with Apollo 11, which landed on the Moon on July 20, 1969. Neil Armstrong and Buzz Aldrin walked on the lunar surface while Michael Collins orbited the Moon in Command Module Columbia. The mission returned to Earth on July 24, 1969, fulfilling Kennedy's challenge.[11]

NASA had contracted for fifteen Saturn V rockets to achieve the goal; at the time no one knew how many missions this would require.[13] Since success was obtained in 1969 with the sixth Saturn V on Apollo 11, nine rockets remained available for a hoped-for total of ten landings. After the excitement of Apollo 11, the general public grew apathetic towards the space program and Congress continued to cut NASA's budget; Apollo 20 was canceled.[14] Despite the successful lunar landing, the missions were considered so risky that astronauts could not afford life insurance to provide for their families if they died in space.[note 2][15]

see caption
Mission Operations Control Room during the TV broadcast just before the Apollo 13 accident. Astronaut Fred Haise is shown on the screen.

Even before the first U.S. astronaut entered space in 1961, planning for a centralized facility to communicate with the spacecraft and monitor its performance had begun, for the most part the brainchild of Christopher C. Kraft Jr., who became NASA's first flight director. During John Glenn's Mercury Friendship 7 flight in February 1962 (the first crewed orbital flight by the U.S.), one of Kraft's decisions was overruled by NASA managers. He was vindicated by post-mission analysis and implemented a rule that, during the mission, the flight director's word was absolute[16] – to overrule him, NASA would have to fire him on the spot.[17] Flight directors during Apollo had a one-sentence job description, "The flight director may take any actions necessary for crew safety and mission success."[18]

Houston's Mission Control Center was opened in 1965. It was in part designed by Kraft and now named for him.[16] In Mission Control, each flight controller, in addition to monitoring telemetry from the spacecraft, was in communication via voice loop to specialists in a Staff Support Room (or "back room"), who focused on specific spacecraft systems.[17]

Apollo 13 was to be the second H mission, meant to demonstrate precision lunar landings and explore specific sites on the Moon.[19] With Kennedy's goal accomplished by Apollo 11, and Apollo 12 demonstrating that the astronauts could perform a precision landing, mission planners were able to focus on more than just landing safely and having astronauts minimally trained in geology gather lunar samples to take home to Earth. There was a greater role for science on Apollo 13, especially for geology, something emphasized by the mission's motto, Ex luna, scientia (From the Moon, knowledge).[20]

Astronauts and key Mission Control personnel

see caption
Swigert, Lovell and Haise the day before launch
Position Astronaut
Commander (CDR) James A. Lovell Jr.
Fourth and last spaceflight
Command Module Pilot (CMP) John "Jack" L. Swigert Jr.
Only spaceflight
Lunar Module Pilot (LMP) Fred W. Haise Jr.
Only spaceflight

Apollo 13's mission commander, Jim Lovell, was 42 years old at the time of the spaceflight. He was a graduate of the United States Naval Academy and had been a naval aviator and test pilot before being selected for the second group of astronauts in 1962; he flew with Frank Borman in Gemini 7 in 1965 and Buzz Aldrin in Gemini 12 the following year before flying in Apollo 8 in 1968, the first spacecraft to orbit the Moon.[21] At the time of Apollo 13, Lovell was the NASA astronaut with the most time in space, with 572 hours over the three missions.[22]

Jack Swigert, the command module pilot (CMP), was 38 years old and held a B.S. in mechanical engineering and an M.S. in aerospace science; he had served in the Air Force and in state Air National Guards and was an engineering test pilot before being selected for the fifth group of astronauts in 1966.[23] Fred Haise, the Lunar Module pilot (LMP), was 36 years old. He held a B.S. in aeronautical engineering, had been a Marine Corps fighter pilot, and was a civilian research pilot for NASA when he was selected as a Group 5 astronaut.[24][25]

According to the standard Apollo crew rotation, the prime crew for Apollo 13 would have been the backup crew[note 3] for Apollo 10, with Mercury and Gemini veteran Gordon Cooper in command, Donn F. Eisele as CMP and Edgar Mitchell as LMP. Deke Slayton, NASA's Director of Flight Crew Operations, never intended to rotate Cooper and Eisele to a prime crew assignment, as both were out of favor – Cooper for his lax attitude towards training, and Eisele for incidents aboard Apollo 7 and an extramarital affair. He assigned them to the backup crew because no other veteran astronauts were available.[28] Slayton's original choices for Apollo 13 were Alan Shepard as commander, Stuart Roosa as CMP, and Mitchell as LMP. However, management felt Shepard needed more training time, as he had only recently resumed active status after surgery for an inner ear disorder and had not flown since 1961. Thus, Lovell's crew (himself, Haise and Ken Mattingly), having all backed up Apollo 11 and being slated for Apollo 14, was swapped with Shepard's.[28]

Swigert was originally CMP of Apollo 13's backup crew, with John Young as commander and Charles Duke as lunar module pilot.[29] Seven days before launch, Duke contracted rubella from his son's friend.[30] This exposed both the prime and backup crews, who trained together. Of the five, only Mattingly was not immune through prior exposure. Normally, if any member of the prime crew had to be grounded, the remaining crew would be replaced as well, and the backup crew substituted, but Duke's illness ruled this out,[31] so two days before launch, Mattingly was replaced by Swigert.[23] Mattingly never developed rubella and later flew on Apollo 16.[32]

For Apollo, a third crew of astronauts, known as the support crew, was designated in addition to the prime and backup crews used on projects Mercury and Gemini. Slayton created the support crews because James McDivitt, who would command Apollo 9, believed that, with preparation going on in facilities across the US, meetings that needed a member of the flight crew would be missed. Support crew members were to assist as directed by the mission commander.[33] Usually low in seniority, they assembled the mission's rules, flight plan, and checklists, and kept them updated;[34][35] for Apollo 13, they were Vance D. Brand, Jack Lousma and either William Pogue or Joseph Kerwin.[note 4][40]

For Apollo 13, flight directors were Gene Kranz, White team[41] (the lead flight director);[42][43] Glynn Lunney, Black team; Milton Windler, Maroon team and Gerry Griffin, Gold team.[41] The CAPCOMs (the person in Mission Control, during the Apollo program an astronaut, who was responsible for voice communications with the crew)[44] for Apollo 13 were Kerwin, Brand, Lousma, Young and Mattingly.[45]

Mission insignia and call signs

see caption
Apollo 13 flown silver Robbins medallion

The Apollo 13 mission insignia depicts the Greek god of the Sun, Apollo, with three horses pulling his chariot across the face of the Moon, and the Earth seen in the distance. This is meant to symbolize the Apollo flights bringing the light of knowledge to all people. The mission motto, Ex luna, scientia ("From the Moon, knowledge"), appears. In choosing it, Lovell adapted the motto of his alma mater, the Naval Academy, Ex scientia, tridens ("From knowledge, sea power").[46][47]

On the patch, the mission number appeared in Roman numerals as Apollo XIII. It did not have to be modified after Swigert replaced Mattingly, as it is one of only two Apollo mission insignia – the other being Apollo 11 – not to include the names of the crew. It was designed by artist Lumen Martin Winter, who based it on a mural he had painted for the St. Regis Hotel in New York City.[48] The mural was later purchased by actor Tom Hanks,[49] who portrayed Lovell in the movie Apollo 13, and it is now in the Captain James A. Lovell Federal Health Care Center in Illinois.[50]

The mission's motto was in Lovell's mind when he chose the call sign Aquarius for the lunar module, taken from Aquarius, the bringer of water.[51][52] Some in the media erroneously reported that the call sign was taken from a song by that name from the musical Hair.[52][53] The command module's call sign, Odyssey, was chosen not only for its Homeric association but to refer to the recent film, 2001: A Space Odyssey, based on a short story by science fiction author Arthur C. Clarke.[51] In his book, Lovell indicated he chose the name Odyssey because he liked the word and its definition: a long voyage with many changes of fortune.[52]

Due to the accident and the last minute crew change of Jack Swigert replacing Ken Mattingly three days prior to launch, the Apollo 13 Robbins medallions flown aboard the mission were melted down and reminted after the mission to reflect the correct crew, and the absence of a lunar landing date.[54]

Space vehicle

CSM-109 Odyssey in the Operations and Checkout Building

The Saturn V rocket used to carry Apollo 13 to the Moon was numbered SA-508, and was almost identical to those used on Apollo 8 through 12.[55] Including the spacecraft, the rocket weighed in at 2,949,136 kilograms (6,501,733 lb).[56] The S-IC first stage's engines were rated to generate 440,000 newtons (100,000 lbf) less total thrust than Apollo 12's, though they remained within specifications.[57] To keep its liquid hydrogen propellent cold, the S-II second stage's cryogenic tanks were insulated; on earlier Apollo missions this came in the form of panels that were affixed, but beginning with Apollo 13, insulation was sprayed onto the exterior of the tanks.[58] Extra propellant was carried as a test, since future J missions to the Moon would require more propellant for their heavier payloads. This made the vehicle the heaviest yet flown by NASA, and Apollo 13 was visibly slower to clear the launch tower than earlier missions.[57]

The Apollo 13 spacecraft consisted of Command Module 109 and Service Module 109 (together CSM-109), called Odyssey, and Lunar Module 7 (LM-7), called Aquarius. Also considered part of the spacecraft was the launch escape system, which would propel the command module (CM) to safety in the event of a problem during liftoff, and the Spacecraft–LM Adapter, numbered as SLA-16, which housed the lunar module (LM) during the first hours of the mission.[59][60]

The LM stages, CM and service module (SM) were received at Kennedy Space Center (KSC) in June 1969; the portions of the Saturn V were received in June and July. Thereafter, testing and assembly proceeded, culminating with the rollout of the launch vehicle, with the spacecraft atop it, on December 15, 1969.[59] Apollo 13 was originally scheduled for launch on March 12, 1970, but that January NASA announced the mission would be postponed until April 11, both to allow more time for planning and to spread the Apollo missions over a longer period.[61] The plan was to have two Apollo flights per year and was in response to budgetary constraints[62] that had recently seen the cancellation of Apollo 20.[63]

Training and preparation

Lovell practices deploying the flag

The Apollo 13 prime crew undertook over 1,000 hours of mission-specific training, more than five hours for every hour of the mission's ten-day planned duration. Each member of the prime crew spent over 400 hours in simulators of the CM and (for Lovell and Haise) of the LM at KSC and at Houston, some of which involved the flight controllers at Mission Control.[64] Flight controllers participated in many simulations of problems with the spacecraft in flight, which taught them how to react in an emergency.[17] Specialized simulators at other locations were also used by the crew members.[64]

The astronauts of Apollo 11 had minimal time for geology training, with only six months between crew assignment and launch; higher priorities took much of their time.[65] Apollo 12 saw more such training, including practice in the field, using a CAPCOM and a simulated backroom of scientists, to whom the astronauts had to describe what they saw.[66] Scientist-astronaut Harrison Schmitt saw that there was limited enthusiasm for geology field trips. Believing an inspirational teacher was needed, Schmitt arranged for Lovell and Haise to meet his old professor, Caltech's Lee Silver. The two astronauts, and backups Young and Duke, went on a field trip with Silver at their own time and expense. At the end of their week together, Lovell made Silver their geology mentor, who would be extensively involved in the geology planning for Apollo 13.[67] Farouk El-Baz oversaw the training of Mattingly and his backup, Swigert, which involved describing and photographing simulated lunar landmarks from airplanes.[68] El-Baz had all three prime crew astronauts describe geologic features they saw during their flights between Houston and KSC; Mattingly's enthusiasm caused other astronauts, such as Apollo 14's CMP, Roosa, to seek out El-Baz as a teacher.[69]

Concerned about how close Apollo 11's LM, Eagle, had come to running out of propellant during its lunar descent, mission planners decided that beginning with Apollo 13, the CSM would bring the LM to the low orbit from which the landing attempt would commence. This was a change from Apollo 11 and 12, on which the LM made the burn to bring it to the lower orbit. The change was part of an effort to increase the amount of hover time available to the astronauts as the missions headed into rougher terrain.[70]

The plan was to devote the first of the two four-hour lunar surface extravehicular activities (EVAs) to setting up the Apollo Lunar Surface Experiments Package (ALSEP) group of scientific instruments; during the second, Lovell and Haise would investigate Cone crater, near the planned landing site.[71] The two astronauts wore their spacesuits for some 20 walk-throughs of EVA procedures, including sample gathering and use of tools and other equipment. They flew in the "Vomit Comet" in simulated microgravity or lunar gravity, including practice in donning and doffing spacesuits. To prepare for the descent to the Moon's surface, Lovell flew the Lunar Landing Training Vehicle (LLTV) after receiving helicopter training.[72] Despite the crashes of one LLTV and one similar Lunar Landing Research Vehicle (LLRV) prior to Apollo 13, mission commanders considered flying them invaluable experience and so prevailed on reluctant NASA management to retain them.[73]

Experiments and scientific objectives

Lovell (left) and Haise during geology training in Hawaii, January 1970

Apollo 13's designated landing site was near Fra Mauro crater; the Fra Mauro formation was believed to contain much material spattered by the impact that had filled the Imbrium basin early in the Moon's history. Dating it would provide information not only about the Moon, but about the Earth's early history. Such material was likely to be available at Cone crater, a site where an impact was believed to have drilled deep into the lunar regolith.[74]

Apollo 11 had left a seismometer on the Moon, but the solar-powered unit did not survive its first two-week-long lunar night. The Apollo 12 astronauts also left one as part of its ALSEP, which was nuclear-powered.[75] Apollo 13 also carried a seismometer (known as the Passive Seismic Experiment, or PSE), similar to Apollo 12's, as part of its ALSEP, to be left on the Moon by the astronauts.[76] That seismometer was to be calibrated by the impact, after jettison, of the ascent stage of Apollo 13's LM, an object of known mass and velocity impacting at a known location.[77]

Other ALSEP experiments on Apollo 13 included a Heat Flow Experiment (HFE), which would involve drilling two holes 3.0 metres (10 ft) deep.[78] This was Haise's responsibility; he was also to drill a third hole of that depth for a core sample.[79] A Charged Particle Lunar Environment Experiment (CPLEE) measured the protons and electrons of solar origin reaching the Moon.[80] The package also included a Lunar Atmosphere Detector (LAD)[81] and a Dust Detector, to measure the accumulation of debris.[82] The Heat Flow Experiment and the CPLEE were flown for the first time on Apollo 13; the other experiments had been flown before.[79]

Haise practices removing the fuel capsule from its transport cask mounted on the LM. The real cask sank unopened into the Pacific Ocean with its radioactive contents.

To power the ALSEP, the SNAP-27 radioisotope thermoelectric generator (RTG) was flown. Developed by the U.S. Atomic Energy Commission, SNAP-27 was first flown on Apollo 12. The fuel capsule contained about 3.79 kilograms (8.36 lb) of plutonium oxide. The cask placed around the capsule for transport to the Moon was built with heat shields of graphite and of beryllium, and with structural parts of titanium and of Inconel materials. Thus, it was built to withstand the heat of reentry into the Earth's atmosphere rather than pollute the air with plutonium in the event of an aborted mission.[83]

A United States flag was also taken, to be erected on the Moon's surface.[84] For Apollo 11 and 12, the flag had been placed in a heat-resistant tube on the front landing leg; it was moved for Apollo 13 to the Modularized Equipment Stowage Assembly (MESA) in the LM descent stage. The structure to fly the flag on the airless Moon was improved from Apollo 12's.[85]

For the first time, red stripes were placed on the helmet, arms and legs of the commander's A7L spacesuit. This was done as, after Apollo 11, those reviewing the images taken had trouble distinguishing Armstrong from Aldrin, but the change was approved too late for Apollo 12.[86] New drink bags that attached inside the helmets and were to be sipped from as the astronauts walked on the Moon were demonstrated by Haise during Apollo 13's final television broadcast before the accident.[87][88]

Apollo 13's primary mission objectives were to: "Perform selenological inspection, survey, and sampling of materials in a preselected region of the Fra Mauro Formation. Deploy and activate an Apollo Lunar Surface Experiments Package. Develop man's capability to work in the lunar environment. Obtain photographs of candidate exploration sites."[89] The astronauts were also to accomplish other photographic objectives, including of the Gegenschein from lunar orbit, and of the Moon itself on the journey back to Earth. Some of this photography was to be performed by Swigert as Lovell and Haise walked on the Moon.[90] Swigert was also to take photographs of the Lagrangian points of the Earth-Moon system. Apollo 13 had twelve cameras on board, including those for television and moving pictures.[79] The crew was also to downlink bistatic radar observations of the Moon. None of these was attempted because of the accident.[90]

Flight of Apollo 13

Apollo 13's circumlunar flight trajectory, showing its distance to the Moon when the accident occurred
The circumlunar trajectory followed by Apollo 13, drawn to scale. The accident occurred about 56 hours into the mission.

Launch and translunar injection

Apollo 13 launches from Kennedy Space Center, April 11, 1970
Apollo 13 spacecraft configuration during most of the journey: Click on image for key to numbered components.

The mission was launched at the planned time, 2:13:00 pm EST (19:13:00 UTC) on April 11. An anomaly occurred when the second-stage, center (inboard) engine shut down about two minutes early.[91][92] This was caused by severe pogo oscillations. Starting with Apollo 10, the vehicle's guidance system was designed to shut the engine down in response to chamber pressure excursions.[93] Pogo oscillations had occurred on Titan rockets (used during the Gemini program) and on previous Apollo missions,[94][95] but on Apollo 13 they were amplified by an interaction with turbopump cavitation.[96][97] A fix to prevent pogo was ready for the mission, but schedule pressure did not permit the hardware's integration into the Apollo 13 vehicle.[93][98] A post-flight investigation revealed the engine was one cycle away from catastrophic failure.[93] The four outboard engines and the S-IVB third stage burned longer to compensate, and the vehicle achieved very close to the planned circular 190 kilometers (120 mi; 100 nmi) parking orbit, followed by a translunar injection (TLI) about two hours later, setting the mission on course for the Moon.[91][92]

After TLI, Swigert performed the separation and transposition maneuvers before docking the CSM Odyssey to the LM Aquarius, and the spacecraft pulled away from the third stage.[99] Ground controllers then sent the third stage on a course to impact the Moon in range of the Apollo 12 seismometer, which it did just over three days into the mission.[100]

The crew settled in for the three-day trip to Fra Mauro. At 30:40:50 into the mission, with the TV camera running, the crew performed a burn to place Apollo 13 on a hybrid trajectory. The departure from a free-return trajectory meant that if no further burns were performed, Apollo 13 would miss Earth on its return trajectory, rather than intercept it, as with a free return.[101] A free return trajectory could only reach sites near the lunar equator; a hybrid trajectory, which could be started at any point after TLI, allowed sites with higher latitudes, such as Fra Mauro, to be reached.[102] Communications were enlivened when Swigert realized that in the last-minute rush, he had omitted to file his federal income tax return (due April 15), and amid laughter from mission controllers, asked how he could get an extension. He was found to be entitled to a 60-day extension for being out of the country at the deadline.[103]

Entry into the LM to test its systems had been scheduled for 58:00:00; when the crew awoke on the third day of the mission, they were informed it had been moved up three hours and was later moved up again by another hour. A television broadcast was scheduled for 55:00:00; Lovell, acting as emcee, showed the audience the interiors of Odyssey and Aquarius.[104] The audience was limited since none of the television networks were carrying the broadcast,[105] forcing Marilyn Lovell (Jim Lovell's wife) to go to the VIP room at Mission Control if she wanted to watch her husband and his crewmates.[106]

Accident

About six and a half minutes after the TV broadcast – approaching 56:00:00 – Apollo 13 was about 180,000 nautical miles (210,000 mi; 330,000 km) from Earth.[107] Haise was completing the shutdown of the LM after testing its systems while Lovell stowed the TV camera. Jack Lousma, the CAPCOM, sent minor instructions to Swigert, including changing the attitude of the craft to facilitate photography of Comet Bennett.[107][108]

The pressure sensor in one of the SM's oxygen tanks had earlier appeared to be malfunctioning, so Sy Liebergot (the EECOM, in charge of monitoring the CSM's electrical system) requested that the stirring fans in the tanks be activated. Normally this was done once daily; a stir would destratify the contents of the tanks, making the pressure readings more accurate.[107] The Flight Director, Kranz, had Liebergot wait a few minutes for the crew to settle down after the telecast,[109] then Lousma relayed the request to Swigert, who activated the switches controlling the fans,[107] and after a few seconds turned them off again.[108]

Follow Lee on X/Twitter - Father, Husband, Serial builder creating AI, crypto, games & web tools. We are friends :) AI Will Come To Life!

Check out: eBank.nz (Art Generator) | Netwrck.com (AI Tools) | Text-Generator.io (AI API) | BitBank.nz (Crypto AI) | ReadingTime (Kids Reading) | RewordGame | BigMultiplayerChess | WebFiddle | How.nz | Helix AI Assistant